

Demo pile cleared in Van Nuys
Broken drywall and lumber from a renovation, piled where the next trade needed to work. It went out mixed, the way it sat, with the trailer backed up to the door.
Debris removal for the pile a project or a storm leaves behind: broken concrete, dirt, old fencing, drywall, lumber, branches and torn-out fixtures, shoveled and loaded by hand and hauled off in our dump trailer. Mixed piles are fine. A Van Nuys renovation and two Downey concrete jobs are on this page with before and after photos. Serving Downey, Whittier, Long Beach, Los Angeles and nearby cities, 7 days a week. Call or text to book your free estimate.


Broken drywall and lumber from a renovation, piled where the next trade needed to work. It went out mixed, the way it sat, with the trailer backed up to the door.




Debris is what's left when the real work is done. The patio came up, the fence came down, the bathroom got gutted, the wind took half the tree. The job is finished and there's a pile sitting where the yard or the driveway used to be.
It's heavier than it looks and it's always in the way. Concrete and dirt in particular weigh far more per shovel than anyone expects, which is why a pile that would be three trips in a pickup is one trip in a dump trailer.
We shovel it, load it by hand, haul it off and leave the spot swept or raked. You don't need a dumpster, a permit or a weekend.
Why weight sets the pace
Our trailer is 8 by 12 feet with 4-foot sides, about 14 cubic yards. A pile of branches fills it by volume. A pile of concrete or dirt fills it by weight long before it reaches the top, and that's the number we plan around.
That's also why clean concrete stays separate from dirt and trash when we load. It handles differently at the other end, and keeping it apart is part of doing the job right.
A single patio or a few yards of dirt is usually one trip. A whole driveway's worth of broken concrete can run over, and we'd rather look at it and say so than promise one trip and need a second.
Who shows up
Every job runs out of an 8 × 12 ft dump trailer with 4 ft sides, about 14 cubic yards of space. Most jobs get a two-person crew, and we do all the lifting, loading and sweeping up.
Project done and the pile's still there?
Same crew, same trailer. Construction debris hauling is written for contractors clearing a job site between phases. This page is for the homeowner with a pile after a project, a teardown or a storm.
Yes. We shovel it and load it by hand. Clean concrete stays separate from dirt and trash on the trailer.
Small slabs, yes, depending on size and thickness. A whole driveway or walkway needs to be broken before we haul the pieces.
No. A mixed pile goes in mixed. We keep concrete apart from the rest as we load.
Yes. We carry or wheel it out through the gate or side path. The distance to the trailer is what sets the pace.
Usually, yes. Same day most of the time, 7 days a week.
Locations served